Pipe lining 915 to 1001

Pipe lining from Manhole 915 to Manhole 1001

Pull a 8” HDPE DR 11 260 foot pipe that was fused and the interior joints debeader in a 10 inch clay tile line with a hydraulic pipe bursting machine, dewatering at both manholes required, sewer by pass pump system used, connections made at the manhole with HDPR water stop

Pipe lining 915 to 1001

Project Name

Pipe lining from Manhole 915 to Manhole 1001


Scope

Pull a 8” HDPE DR 11 260 foot pipe that was fused and the interior joints debeader in a 10 inch clay tile line with a hydraulic pipe bursting machine, dewatering at both manholes required, sewer by pass pump system used, connections made at the manhole with HDPR water stop

  • Pipe lining 915 to 1001
  • Pipe lining 915 to 1001
  • Pipe lining 915 to 1001
  • Pipe lining 915 to 1001
  • Pipe lining 915 to 1001
  • Pipe lining 915 to 1001
  • Pipe lining 915 to 1001
  • Pipe lining 915 to 1001
  • Pipe lining 915 to 1001
  • Pipe lining 915 to 1001
  • Pipe lining 915 to 1001
  • Pipe lining 915 to 1001
  • Pipe lining 915 to 1001
An unhandled error has occurred. Reload 🗙

Rejoining the server...

Rejoin failed... trying again in seconds.

Failed to rejoin.
Please retry or reload the page.

The session has been paused by the server.

Failed to resume the session.
Please reload the page.